YUGA
Vision · Strategy · Execution0%
YUGA
Baled agricultural straw - bio-bitumen feedstock
Vertical A · YUGA PMC

Agro-waste becomes road. We design and plan bio-bitumen, plastic-to-fuel and tyre-to-oil plants end to end - CSIR-CRRI (KrishiBind) aligned and NHAI/MoRTH compliant.

What We Build

Petroleum and bitumen product plant
A1

Bitumen Product Plants

Emulsion, PMB, CRMB, Decanter and Blown / Oxidised Bitumen production lines.

Bitumen EmulsionPMB - Polymer ModifiedCRMB - Crumb Rubber ModifiedBitumen DecanterBlown / Oxidised
Farm fields supplying agro-waste biomass
A2

Pyrolysis Bio-Bitumen Plant

Agro-waste → pyrolysis → bio-oil blended 15-30% with VG-30 to CSIR-CRRI (KrishiBind) spec. NHAI/MoRTH compliant.

CSIR-CRRI KrishiBind aligned15-30% bio-replacementNHAI / MoRTH certified
Plastic waste for plastic-to-fuel conversion
A3

Plastic-to-Fuel Plant

Waste plastic converted via pyrolysis to usable fuel/oil - aligned with India's plastic-waste (EPR) push.

EPR alignedWaste-to-energyUsable fuel / oil output
End-of-life tyres for rubber-to-oil pyrolysis
A4

RPO - Tyre / Rubber-to-Oil

End-of-life tyres and rubber converted via pyrolysis to Recovered Pyrolysis Oil, carbon black and steel.

Recovered Pyrolysis OilCarbon black + steelCircular economy
The 4-Stage Process

A continuous, NHAI-spec pipeline - heat, refine, blend, certify.

01

Raw Material & Pelletization

Agro-waste - rice straw, groundnut shells, cotton stalk, bagasse - sourced within 50-100 km and pelletized.

02

Pyrolysis & Bio-Oil Extraction

Biomass heated to 450-550°C in oxygen-free reactors; bio-oil yield of 20-25%.

03

Refining & Blending

Oxidation at 230-250°C, then blended 15-30% with VG-30 per CSIR-CRRI specification.

04

Testing, Certification & Market

Penetration, softening, ductility and rutting tests; NHAI/MoRTH certification; supply to contractors, PWD & NHAI.

Capacities & Investment

Indicative only - exact cost depends on location, land, biomass availability and process stages.

CapacityInvestmentBest for
5 MT/Day₹1.5 CrTrial / Entry-level
10 MT/Day₹3.0 CrSmall MSME / Individual
15 MT/Day₹4.5 CrMSME Scale
20 MT/Day₹8.0 CrMedium Scale
25 MT/Day₹10.0 CrMedium-Large Scale
30-50 MT/Day₹12-16 CrCommercial / Industrial
75 / 100 MT/DayCustomLarge industrial
Baled agricultural straw - bio-bitumen feedstock
Size & Finance It

Build a CAPEX with add-ons, then see the term-loan split, EMI and CGTMSE eligibility — all indicative, instant.

Project valuation builder

Configure CAPEX
Total project cost
₹6–10 Cr
Output / yr
900–1,500 MT bio-binder/yr
Base ₹6–10 Cr + add-ons ₹0 Cr

Indicative — actual CAPEX depends on vendor quotes, location and scope. Contact us for an exact DPR.

Why Now

1st

India = first country to commercially produce Bio-Bitumen (Jan 2026)

49%

of India's bitumen is imported - ~₹25,000 Cr / year

₹4,500 Cr+

potential annual saving from 15-30% bio-replacement

From feasibility to first commercial production - and the capital to fund it.